皇冠正网代理开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠正网代理开户的平台。皇冠正网代理开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

,DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

PETALING JAYA: Dagang Nexchange Bhd’s (DNeX) subsidiary Ping Petroleum UK PLC has taken delivery of the Sevan Hummingbird floating production, storage and offloading (FPSO) vessel from marine energy transportation company, Teekay Corp.

DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the group anticipates full operational deployment of the FPSO on the Avalon field development project in the North Sea by 2025.

“We have a tangible asset ready with the newly acquired Sevan Hummingbird. Our next step is to secure approval for our field development plan, which will be submitted in the coming months,” he said yesterday.

Ping has received a “no objection” letter from the North Sea Transition Authority in March and was then granted a 19-month extension from the authority to the second term of the P2006 licence containing the Avalon field.

“The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external, low-carbon source,” DNeX said.

Ping is also evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility which will help minimise diesel usage and associated greenhouse gas emissions.

The planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the United Kingdom’s energy security and net-zero targets.

Commissioned in 2008, the Sevan Hummingbird FPSO is a 60 metre-diameter facility with a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.

With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Avalon, Ping’s second oilfield asset, is expected to come onstream in 2025.


转载说明:本文转载自Sunbet。 Allbet声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:皇冠正网代理开户(www.hg108.vip)_DNeX unit takes delivery of FPSO from Teekay
发布评论

分享到:

新2代理网址(www.hg108.vip)_Powerwell puts business back on track
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。